Sperante
Sperante Group

Product range

Sperante Group

Built for twelve classes a day. Anodised aluminium chassis over a beech deck, low profile so a row of ten reads level across a studio floor, and a spring bar the instructor can change one-handed between exercises.

Frame
244 x 68 x 34 cm
Chassis
6063-T5 aluminium
Springs
5
Weight
52 kg

02

Technical data

Our reading on the left, the standard on the right.

Values are from the current production batch and the test log that accompanies it. Where a European standard sets the limit we name the standard; where we set it ourselves we say so, because an in-house limit and a legal one are not the same thing and pretending otherwise is how this trade loses buyers.

ParameterUnitSperanteLimit / standard
Frame lengthcm245± 3 mm build tolerance
Carriage travelcm100— declared
Declared maximum user masskg150EN ISO 20957-1, declared by maker
Endurance test completedcycles250,000Class S requires 100,000
Rail deflection at 150 kgmm1.1in-house reject above 3.0
Rolling noise at 1 mdB(A)34in-house reject above 45
Frame timber moisture at assembly%8 ± 1EN 942 interior joinery
Formaldehyde emission, frameppm0.03EN 717-1 class E1 <= 0.1
Upholstery abrasionMartindale cycles100,000EN ISO 12947-2, tested
Upholstery ignitionpassEN 1021-1 and -2
Foam densitykg/m360CMHR grade
Carriage bearings8 x sealed ABEC-7— declared
Spring rate, mediumN/mm0.42± 5 % between springs of a set
Surface finish VOCg/l< 90Directive 2004/42/EC <= 130
Assembly time, one personmin25— measured, not estimated

EN ISO 20957-1 covers stationary training equipment and Class S is the designation for equipment used in studios, clubs, rehabilitation centres and other supervised training areas — as distinct from Class H for home use. The endurance protocol loads the machine to the declared maximum user mass with all springs engaged and cycles it at 80 % of carriage travel.

Full technical data, quality window and container loading

Send the mix. We will send the stow plan.

Tell us the models, the annual quantity and the destination port. You get a unit price, a container loading plan and a delivery date — usually within the same working day.